Request a quote [email protected]
YF-L01 Pull Handles

YF-L01 Round Tube Glass Door Pull

YF-L01: two straight stainless steel tubes of Ø 38 mm on round standoffs, shown in satin stainless, matte black and satin brass. MOQ 500 pcs per model and finish.

Material
Stainless steel
Finishes
SSMBSB
Overall length
600 – 2000 mm
Minimum order
500 pcs per model and finish
Lead time
30–45 days after sample approval

Request pricing for this part

Tell us your annual volume and target price. An engineer replies within one business day — no automated quotes.

WhatsApp

YF-L01 is a stainless steel glass door pull from our pull handle range, sold in pairs for glass and timber entrance doors. Two straight stainless steel tubes of Ø 38 mm on round standoffs, shown in satin stainless, matte black and satin brass.

Design and finishes

Standard finishes for YF-L01 are satin stainless, matte black and satin brass. Finish samples can be sent before production, and the finish chart explains how each finish is made and how it wears.

Construction and fit

The pull is made of Ø 38 mm round tube in stainless steel and supplied as a pair, one for each face of the door, with fixings for through-bolting. Overall length can be specified anywhere from 600 to 2000 mm, with a centre-to-centre distance from 400 to 1600 mm, so the pull can be sized to the door rather than the other way round. Glass doors need the hole positions drilled before tempering, so the centre-to-centre distance must be fixed with the glass supplier at the drawing stage. Finishes are satin stainless, matte black and satin brass.

Where it fits

On a project schedule, YF-L01 is a good fit for glass shopfronts, office entrances, timber entrance doors and barn doors. Other common uses: residential entrance and interior doors, hotel guest rooms and corridors, light commercial fit-out and renovation and replacement. If you prefer a square profile, see YF-L02.

Ordering, packing and OEM

The minimum order is 500 pieces per model and finish. YF-L01 is packed as a set of 2 pulls with fixings, one set per door; carton size depends on the length you order. Production lead time is 30 to 45 days after sample approval. Mechanical parts carry a 5-year warranty and finishes a 2-year warranty from shipment.

Every order is produced in Zhongshan under our ISO 9001:2015 system, certificate 130590 from NQA; see quality and certification for certificates and test standards. Matte black uses the same finish code as our lock collections, so the pulls can be ordered to match the locks on the same project.

For private label, the OEM and ODM service covers packaging, barcodes, a laser-marked logo on the standoff and your own model numbers, ready 30 to 45 days after artwork approval. Before a first order, read our ordering guide and door hardware for coastal projects, or send us your door schedule for a quotation.

Key features

  • Ø 38 mm round stainless tube
  • 600 – 2000 mm overall length
  • Supplied in pairs with fixings
Technical parameters · YF-L01
Parameter Value
Finishes SS · MB · SB
Overall length 600 – 2000 mm
Centre-to-centre 400 – 1600 mm
Material Stainless steel
Packing 2 pcs / set

Non-standard dimensions, materials and surface treatments available on request.

01

Residential entrance and interior doors

02

Hotel guest rooms and corridors

03

Light commercial fit-out

04

Renovation and replacement

500 pieces per model and finish. YF-L01 is packed as a set of 2 pulls with fixings, one set per door; carton size depends on the length you order. Trial orders can mix models or finishes in one shipment.
Two straight stainless steel tubes of Ø 38 mm on round standoffs, shown in satin stainless, matte black and satin brass. It suits glass shopfronts, office entrances, timber entrance doors and barn doors.
Overall length from 600 to 2000 mm, centre-to-centre from 400 to 1600 mm. Fix the centre-to-centre with your glass supplier before the glass is tempered.
Yes. It is supplied as a pair, one pull for each face of the door, with fixings for through-bolting.
Yes. OEM and ODM covers packaging, inserts, laser logo, own model numbers and barcodes, 30 to 45 days from artwork approval.
01

Related

Others in this family

Ready to price this into your build?

Send volumes and drawings — we return a costed quotation with tooling and lead time inside 48 hours.